Tuesday, May 28, 2013

Slowly making progress, no trains for a while yet






I've run out of 50mm insulation board so I am going to measure what else I need and order the remaining stuff for 1 delivery.

The depth of the roof framing will only allow for 25mm insulation board, I'll need MDF for the baseboards and 2" x 2" for the legs.  I already have some 2" x 1" and 3" x 1" for the battens.

Friday, May 24, 2013

Two photos showing the progress I have made

Took a few days off work to get things moving on the shed front.  I worked from home on Wednesday and the electrician choose that day to come and do his bits which was handy.  I now have two fluorescent tubes and four double sockets in the shed.

I got five sheets of plywood and five sheets of insulation delivered and am now in the process of fitting the insulation to the gaps in the shed wall frames.

Once a wall is fully insulated I will be able to cover that with the plywood leaving a nice finish and hopefully making a cosy shed.

Here is where I have got to :



Monday, May 6, 2013

Photos, photos and more photos

The day has finally arrived when my shed was delivered and installed.

Here is a photographic record of the different stages.  The final interior shots don't really portray the size of the shed but it is 16 feet x 10 feet or 5m x 3m in new money.








Sunday, May 5, 2013

Back to plan A

Just got a call from the Shed supplier to say the factory is loading my shed ready for delivery tomorrow.

All the ground works are complete so I don't mind them delivering it a week earlier than plan B.

Will post a photo or 2 tomorrow when I get home from work.